The smallest room in the house, and the one with the most decisions per square foot.

Waterproofing, slope, drain location, tile coursing, glass, ventilation, clearances and a dozen fixtures — all fixed in place, all connected to each other, and all far cheaper to decide on paper than on the wall.

Delivered anywhere

Primary bathroom with a freestanding tub between fluted oak vanities
Primary bath · Completed

The part nobody sees is the part that matters most.

Waterproofing is invisible when it is done right and catastrophic when it is not. We specify it as a system — membrane type, coverage, transitions and how it terminates — rather than leaving it to whoever is setting the tile — and we hold a quality gate at that stage, before anything covers it.

Dimensioned elevation taped to a stud in a framed house
Tiles dry-laid on a subfloor with chalk lines

Before the tile

What gets drawn

Tile coursing

Dimensioned on the elevation, so a cut lands where you would have chosen it and a niche lands on a grout line rather than through one.

Plumbing locations

Set against the plan before demolition. Whether the drain moves is the single cheapest — or most expensive — decision in the room.

Curbless entry

A floor structure decision, not a finish upgrade. The slope comes from a recessed pan or a raised floor, and that is settled at design.

Niche and bench heights

Drawn against the coursing and against the people who will use them, not placed on site by eye.

Glass

Framed, semi-frameless and frameless are three different details and three different prices. A frameless panel over a curbless entry is measured after the tile is set.

Finish schedule

Every fixture, tile and piece of hardware pinned down to the exact product, finish, quantity and installed price.

Bathrooms

Drawn first, then built.

  • Guest bath walk-in shower with a recessed niche and gray vanity

    Guest bath · Completed

  • Double dark vanity under a backlit tile wall

    Bathroom · Completed

  • Powder room with a cast-iron pedestal sink and checker floor

    Powder room · Completed

  • Outdoor shower in hand-painted tile with a brass rain head

    Outdoor shower · Completed

  • Powder room mirror above a pedestal sink

    Powder room · Completed

  • Bathroom material table with tile, stone and brass samples

    Primary bath · Design

  • Bathroom material table with tile and finish samples

    Bathroom · Design

Existing bathroom floor planExisting
Proposed bathroom floor plan with a freestanding tubProposed
Primary bath · Existing and proposed plan
Dimensioned elevations of the primary bathroomElevations
Shower tile layout elevations and perspectiveShower layout
Primary bath · Construction drawings
Floor tile layout plan with starting pointsFloor tile layout
Wall tile layout elevations with starting pointsWall tile layout
Primary bath · Tile layout, drawn before a single tile is cut
Render of the primary bathroomDesigned
The finished primary bathroomBuilt
Primary bath · Render, then completed

What is behind the wall

In a house built before the mid-1980s you should expect to find something — cast iron drain at the end of its life, galvanized supply, missing blocking, a vent that was never right. It belongs in the budget as a range from the start, not as a conversation in week three.

What a bathroom remodel costs in Pinellas County →

The same bathroom, finishedThe bathroom as we found it
Same room, same camera · Drag to compare

If the house is in a flood zone, the design starts earlier.

In St. Petersburg and unincorporated Pinellas the threshold that decides your budget is 49% of the structure value, not 50%; in Clearwater, Gulfport and the beach cities it is 50%. Either way, the land is not included. We establish that number in the feasibility scope so it shapes the design instead of interrupting it.

The 49% rule, explained →

Investment

Bathroom design from $4,600, as part of Full-Service Interior Design.

Complete renovation investment is set once scope and existing conditions are understood. Construction is delivered under a licensed registered contractor.

Guest bath before, with old tile and vanityBefore
Guest bath after, with a walk-in showerAfter
Guest bath · Completed
Bathroom before, with a dark single vanityBefore
Bathroom after, with a double vanity and lit tile wallAfter
Bathroom · Completed
Glass walk-in shower lined in veined porcelain
Oak vanity beside the toilet room door

Primary bath · Completed

Bathroom design near you

Tampa · St. Petersburg · Clearwater · Dunedin · All areas

Questions

Questions about bathroom design

All questions→
What does a bathroom design include?

A plan and elevations with the tile coursing dimensioned, plumbing rough-in locations, the waterproofing approach, niche and bench heights, glass dimensions, lighting and ventilation, and a finish schedule naming every fixture, tile and piece of hardware with its installed price.

Why does tile layout need a drawing?

Because otherwise the cut lands wherever it falls. Drawing the coursing in advance decides where a tile is cut, whether a niche lands on a grout line, and how the pattern meets the corner — three things that are free to change on paper and expensive to change on the wall.

Can you design a bathroom without moving the plumbing?

Yes, and it is usually the least expensive decision available to you. Most of Pinellas is slab-on-grade, so moving a drain means cutting concrete.

What makes a curbless shower different?

It is a floor structure decision, not a finish upgrade. The slope has to come from somewhere — either a recessed pan or a raised floor across the room — and that is decided at design, not at demolition.

How long does a bathroom take to build?

Typically four to seven weeks on site once selections are final and materials have landed. Selections and lead times set the start date, not crew availability.

What is the part nobody sees?

The waterproofing. It is invisible when it is done right and catastrophic when it is not, which is why it is specified as a system — membrane type, coverage and how it terminates — rather than left to whoever is setting the tile.