A Couple & A DreamTell us about your project
Tell us about your project

New construction

The best time to design a house is while it is still on paper.

Delivered anywhere

Most new homes are decided twice: once by the builder, and again by the owner, eighteen months later, at considerable expense. Outlet locations that ignore where the furniture will go. A kitchen laid out around a standard plan instead of the way you cook. Lighting placed by a rule of thumb rather than by what happens in that room at night.

A dimensioned elevation taped to a stud in a framed house
An existing coastal home before its redesign

On site · At framing

We work alongside the build, not after it

Interior layouts and how you will move through them. Millwork and built-ins drawn to elevation. Lighting and reflected ceiling intent, coordinated before the ceiling closes. Plumbing and appliance locations set against a real plan. Finish direction across the whole house so the transitions work. Furnishings planned against the construction schedule instead of the move-in date.

Exterior · Before to concept · Design

Custom homes, spec homes and builder collaborations

For a custom home, the design direction is developed with you and coordinated with your builder and the licensed professionals on the project. For a spec home the objective is different: identity and material decisions that make the property distinctive in its market, controlled where standardization protects the budget.

Construction contracting and required sealed documents are handled by the licensed parties identified for the project. Our role is the interior design and its coordination.

White massing model of a house resting on drawings
Hands holding a set of printed plans

Plans, before the build

Investment

Priced per square foot of conditioned space, with the minimum stated before we start.

Scoped by square footage and by how much of the house is included.

Exterior elevations of a coastal residenceElevations
Rendered coastal residence with a central stair and motor courtThe concept
Coastal residence · Elevations and concept · Design
Dark residential hallway with warm wall lighting
Residential hall · Design concept

Questions

Questions about new construction

All questions→
Why hire an interior designer while the house is still being built?

Because most new homes are decided twice — once by the builder, and again by the owner eighteen months later, at considerable expense. Outlets placed before anyone knew where the furniture goes, a kitchen laid out to a standard plan, lighting positioned by rule of thumb rather than by what happens in that room at night.

Do you work with my builder?

Yes. The design direction is developed with you and coordinated with your builder and the licensed professionals on the project. Construction contracting and sealed documents stay with them.

Can you do this for a spec home?

Yes, and the objective is different: identity and material decisions that make the property distinctive in its market, with standardization where it protects the budget.

How is it priced?

By area — a rate per square foot of conditioned space with a stated minimum — because that is the only honest way to price a house that does not exist yet.